Development Updates of Almeria Verde, Dagupan City (as of November 8, 2016) November 14, 2016

Literally, our roads to progress. Here are the subdivision development updates in Almeria Verde Dagupan City: as of November 8, 2016

 

Almeria Verde Dagupan City

As of November 8, 2016

 

Doing an earthwork; a tractor removing the dirt in preparation for the road construction. Earthwork is one of the most important steps in the road construction because it establishes a stable foundation. Roads with a low-grade foundation will prematurely fail. Sta. Lucia Land, Inc. (SLLI) ensures a proper road preparation for well-built roads.

 

 

Almeria Verde Dagupan City

As of November 8, 2016

 

Laying and spreading the gravel; for the completion of the earthwork, it is a must to place standard layers on the road. Followed by moistening and compacting of each layer. Adding gravel layers will continue until the road bed reaches a designed height.

 

 

Almeria Verde Dagupan City

As of November 8, 2016

 

Road paving; the last part of the road construction. Concrete is being placed and flattened into steel molds. To prevent cracks, it is a must to cut concrete slabs – allowing the slabs to expand and contract as the temperature changes.

 

 

Almeria Verde Dagupan City

As of November 8, 2016

 

Arranging and construction of underground water pipeline system along the area. Sta. Lucia Land, Inc. (SLLI) ensures to bring water supply to all home owners.